A Little Night Work December 4, 2023 by Paul Harvey It’s move-in night for the Graz engine! The lights are on and it’s time for some “night shift” work. This night’s job was to move parts of the Graz engine from temporary storage into the Diesel Centrale CPM building and stage them there for assembly. Each half of the Graz flywheel made a short trip from temporary storage via forklift. The heating system in the building is now operating so that engine assembly and installation can proceed through the winter months. This photo shows the Benz engine (left) and some major parts of the Graz, including the flywheel halves, cylinder, and base with the crankshaft.